Livingstone Cablelayer Installation
Customer: Tide Way / Shipyard Reimerswaal
Project: Livingstone Cablelayer Installation
Year: 2017
Location: Flushing – The Netherlands
Work carried out: Production and installation of switch panels, lighting and
cable-installation.
New Tankpit TP6
Customer: Stolthaven Moerdijk
Project: New Tankpit TP6
Year: 2015 / 2016
Location: Engineering done in office Prior Projects
Work carried out: Engineering of complete new Tankpit TP6 incl. piping, pumppit, truckloading,
and structural steel.
Revamp pumppit 3 & 5
Customer: NuStar Energy LP, site Amsterdam
Project: Revamp pumppit 3 & 5
Year: 2015
Location: Engineering done in office Prior Projects
Work carried out: 3D scanning and moddeling of as-is situation, re-routing piping and
engineering of 1 extra pump per pumppit.
Engineering, supervising and construction management of new tankpark
Customer: Vesta Terminal Flushing BV
Project: Engineering, supervising and construction management of new tankpark.
Year: 2012/2013
Location: Vlissingen harbour, engineering done at office Prior Projects, supervising and construction management on site.
Work carried out: Multidisciplinary engineering (basic & detail), supervising and project management during construction. Assistance with comissioning.
Stress calculation pressure tank
Customer: Evides drinking water NV
Project: Stress calculation pressure tank.
Year: 2014
Location: Engineering done in office Prior Projects.
Work carried out: Calculation with Final Elements Method (FEM) Ansys.
Demobilization vessel: Pacific Orca
Customer: Swire Blue Ocean
Project: Demobilization vessel: Pacific Orca.
Year: 2017
Location: Vlissingen, The Netherlands.
Work carried out: Demobilization, removal of deck equipment.
Production of Well Head Module
Customer: Heerema Marine Contractors (HMC)
Project: Production of Well Head Module.
Year: 2016
Location: Vlissingen, The Netherlands.
Work carried out: Production of Well Head Module.
Stabilisation Tanks for the Thialf
Customer: Heerema Marine Contractors (HMC)
Project: Stabilisation Tanks for the Thialf.
Year: 2015
Location: Vlissingen, The Netherlands.
Work carried out: Contruction fitted/welded and painted according offshore standards.
Demobilization/mobilization of Aeolus
Customer: Van Oord
Project: Demobilization/mobilization of Aeolus.
Year: 2017
Location: Vlissingen, The Netherlands.
Work carried out: Demobilization/mobilization of Aeolus for an offshore wind project.
Construction Ruijter Platform
Customer: Heerema Fabrication Group (HFG)
Project: Ruijter Platform.
Year: 2013
Location: Vlissingen, The Netherlands.
Work carried out: Fitting, welding and painting according to offshore standards.
Demobilization/mobilization of Nexus
Customer: Van Oord
Project: Demobilization/mobilization of Nexus.
Year: 2015/2016
Location: Vlissingen-Oost, The Netherlands.
Work carried out: Installation of cable laying installation, replacement of deck equipment, change of electrical installation.
Production of Oil Tanks
Customer: Geldof Belgium
Project: Production of oil tanks.
Year: 2015
Location: Vlissingen, The Netherlands.
Work carried out: Production of oil tanks; tank roofs and bottom parts.
Construction of the sea vessel OHVS Walney
Customer: Iemants
Project: Construction of the sea vessel OHVS Walney.
Year: 2016
Location: Vlissingen, The Netherlands.
Work carried out: building and welding and conservating decks for OHVS Walney offshore wind park.
Construction of suction buckets
Customer: Smulders
Project: Construction of suction buckets.
Year: 2017
Location: Vattenval, The Netherlands.
Work carried out: construction of suction buckets.
Construction of a girder crane
Customer: VDS Staal en Machinebouw
Project: Girder crane 2×70 tons, 12 meters high.
Year: 2016
Location: Vlissingen, The Netherlands.
Work carried out: Construction of the crane in the harbour of Vlissingen.
MS Bucentauer (monitoring vessel)
Customer: VDS / Fugro
Project: ms Bucentauer (monitoring vessel)
Year: 2008
Location: Engineering done in office Prior Projects
Work carried out: Detail engineering structural Tower construction
Gevelingenbrug
Customer: Labrujère Staalbouw BV / Rijkswaterstaat
Project: Upgrade of mechanical drive and electrical installation
Year: 2017
Location: Engineering done in office Prior Projects
Work carried out: Engineering of new mechanical drive lift bridge “Grevelingenbrug”.
New building of Demi Water Plant (DWP-2)
Customer: Evides Industriewater NV
Project: New building of Demi Water Plant (DWP-2)
Year: 2017
Location: Rotterdam Maasvlakte
Work carried out: Site supervision (clients’ representative) mechanical
Mechanical Engineering of various equipment
Customer: various clients
Project: as underscribed
Year: 2012-2017
Location: Engineering done in office Prior Projects
Work carried out: Mechanical Engineering of various equipment
Design of a mechanical lock system for a bridge.
Design of a mechanical winch.
Design of a diving cage.
Design of a vacuum bulk picking tool.
Mobilization / demobilization of vesselequipment: Sea Installer
Customer: A2SEA
Project: Mobilization / demobilization of vesselequipment: Sea Installer
Year: 2013
Location: Vlissingen-Oost, The Nederlands.
Work carried out: Replace deck equipment, change electrical installation, install tower foundation, produce and install Blade racks, replacement of watertight doors.
Demobilization/mobilzation of ms Seafox 5
Customer: SEAFOX
Project: Demobilization/mobilzation of ms Seafox 5.
Year: 2015
Location: Vlissingen, The Nederlands.
Work carried out: Removal of deck equipment new deckequipment installed.
Demobilization/mobilzation Offshore Wind
Customer: MPI
Project: Demobilization/mobilzation Offshore Wind.
Year: 2015
Location: Vlissingen, The Nederlands.
Work carried out: (de)Mobilization.
Production Transition Piece
Customer: Van Oord
Project: Transition Piece.
Year: 2010
Location: Vlissingen-Oost, The Nederlands.
Work carried out: (de)Mobilization.
Installation of Cablelay Equipment Vessel Jan Steen
Customer: Van Oord
Project: Vessel Jan Steen.
Year: 2016
Location: Vlissingen, The Nederlands.
Work carried out: Installation of Cablelay Equipment.
Demobilization/mobilzation of Vole au Vent
Customer: Jan de Nul
Project: Demobilization/mobilzation of Vole au Vent.
Year: 2017
Location: Vlissingen, The Nederlands.
Work carried out: Demobilization/mobilzation offshorewindproject including de enginering and erecting of de steel structures.
Conservation of Monopiles
Customer: EEW / SIF
Project: Conservation of Monopiles.
Year: 2015/2016/2017
Location: Vlissingen, The Nederlands.
Work carried out: Conservation (cleaning, gritblasting, painting and marking) of monopiles for the offshore wind sector.
Construction of the bridge "Groene verbinding"
Customer: City of Rotterdam
Project: Bridge “Groene verbinding”.
Year: 2015
Location: Motorway A15 Rotterdam, The Netherlands.
Work carried out: Production, conservation and installation of the bridge over the motorway.
Construction and conservation of monopiles for Westermeerwind
Customer: Siemens
Project: Westermeerwind.
Year: 2014
Location: Ijsselmeer, The Netherlands.
Work carried out: Welding attachment and conservation acccording to offshore standards.
Refurbishment of 11 nacelles
Customer: Gould Services BV
Project: Refurbishment of 11 nacelles.
Year: 2018
Location: Vlissingen, The Netherlands.
Work carried out: Refurbishment of 11 complete nacelles.
Construction of a girder crane 2
Customer: Bilfinger
Project: Girder crane 1400 tons, 80 meters high.
Year: 2016
Location: Poland.
Work carried out: Construction of the crane pieces in the harbour of Vlissingen. Assembly of the crane in Poland.
Prior Projects B.V.
Herculesweg 16
4338 PL Middelburg
+31 (0)118 674 074
info@priorprojects.nl
Prior Projects B.V.
Herculesweg 16
4338 PL Middelburg
+31 (0)118 674 074
info@priorprojects.nl